Installation and replacement process of basin support

Source:Jiangsu Wanbao      Release date: 2021-05-21
Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, whic
Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, which has attracted wide attention from the industry.
1. Determine the principled jacking plan based on the actual situation, that is, partial jacking or overall jacking. The advantage of local jacking is that it is easy to control the jacking and reduce equipment investment; the disadvantage is that jacking can easily lead to large deformation of the beam and a long construction period. The advantage of overall jacking is that it is easy to control the stress in the beam and the construction period is shorter, but more jacking equipment and personnel are required, and it is difficult to coordinate and control the deformation of various parts during the jacking process. If the design permits, try to give priority to partial jacking.
2. Calculate the theoretical jacking reaction force value of each part according to the beam structure form and design parameters, and determine the appropriate number and model of jacks according to the reaction force. The basic principles of "large size, moderate quantity, and controllable grading" should be followed when selecting models.
Large: It means to choose a jack model with a larger safety reserve factor as much as possible. For example, when choosing a jack, ensure that the actual jacking force is less than 75% of the theoretical jacking force.
Moderate quantity: It means that it is not advisable to use more jacks to achieve the requirement of total jacking force, and at the same time, it should not be too few, that is, there should be at least one jack on both sides of each support. More jacks will make it difficult to work together, and too few jacks will cause difficulty in starting or once an individual jack fails, it will affect the entire jacking process.
Hierarchical controllable: The jacking equipment with synchronous jacking information control system or the jack equipment with throttle control should be preferred to realize jacking synchronization or difference limit control.
3. It is necessary to choose the setting position of the jacking point reasonably to avoid local damage of the concrete. According to the design drawings, the top surface of the jack should be arranged within the beam, or the lifting surface should be adjusted to within the beam by means of beams or longitudinal beams. If conditions permit, the jack should be arranged near the support position on the cover beam. The force-bearing surface should adopt wedge iron, with a large force-bearing area, adjust the vertical and horizontal slope of the bottom of the box girder to ensure that the jack can apply force vertically.
4. When the space between the cover beam and the bottom of the beam cannot meet the jack layout requirements, a bearing column should be used as the back of the jack. When the pier column is not high, the bearing column should be placed on the cap, otherwise the foundation should be handled well to ensure that the strength and deformation of the foundation meet the lifting requirements. When the pier column is too high or the water pier should adopt the hoop method, the bearing column should be placed on the hoop corbel. The design of the bearing column should ensure sufficient strength and rigidity. The load-bearing column should preferentially adopt the steel pipe form.
5. In the jacking plan, the command and dispatch, information transmission, and feedback mechanism in the jacking process should be formulated in detail to ensure that the entire process is strictly controlled. Priority should be given to the use of walkie-talkies for synchronous information transmission, and the responsibilities and division of labor of management and operators at all levels should be clearly defined.
6. The jacking plan should clarify the emergency control measures for various risks, formulate several sets of emergency adjustment plans, implement them according to the favorable plan, and prepare according to the unfavorable plan to prevent serious quality accidents or safety accidents.
7. The lifting plan should clarify the control methods and measures for the synchronous displacement or the difference limit during the lifting process, and supplement it with real-time monitoring and measurement of displacement, stress, strain, etc. when necessary to ensure the safety of the existing beam.

8. The method of removing the old support and installing the new support shall be described in detail in the jacking plan. In particular, the installation process methods of the new bearing installation and the bridge construction are very different due to the constraints of different conditions in different periods. There may be local adjustments of the bearing installation method, which should be clarified in the plan.

Basin support

中文字幕欧美日韩精品_不卡av在线网站_韩国国内大量揄拍精品视频_亚洲国产小视频
国产精品免费成人| 国产人妻777人伦精品hd| 韩国一区二区在线播放| 情侣黄网站免费看| 久久艹国产精品| 国产高清999| 国产性生交xxxxx免费| 免费av手机在线观看| 国产成人生活片| 欧美日韩在线免费观看视频| 欧美三级理论片| 色婷婷综合久久久久中文字幕| 91精品国产91久久久久麻豆 主演| 亚洲成人手机在线观看| 久久国产这里只有精品| 成人午夜激情av| 日本黄色三级大片| 97国产精东麻豆人妻电影| 久久国产午夜精品理论片最新版本| 三年中文高清在线观看第6集 | 亚洲熟妇无码一区二区三区| 一级性生活视频| 日韩中文在线字幕| youjizz.com亚洲| 久久精品久久99| 超碰中文字幕在线观看| 欧美激情第四页| 美国av在线播放| 99re6这里有精品热视频| 最新中文字幕2018| aaa一级黄色片| 国产熟人av一二三区| 中文字幕欧美人妻精品一区| 亚欧在线免费观看| 亚洲精品乱码久久久久久自慰 | 91香蕉视频免费看| 久久久成人精品一区二区三区| 国产毛片久久久久久| 久久久久福利视频| aa视频在线播放| 人妻无码视频一区二区三区| www.99r| 精品成在人线av无码免费看| 欧美 国产 综合| 污污网站在线观看视频| 成人在线免费观看网址| jizzjizzxxxx| 国产视频1区2区3区| 中国女人做爰视频| 成年人免费大片| 在线免费看v片| 日韩一级在线免费观看| 青青草影院在线观看| 国产精品无码专区av在线播放 | 五月激情五月婷婷| 国产精品久久久久久久乖乖| 九九精品久久久| 自慰无码一区二区三区| 四虎1515hh.com| chinese少妇国语对白| 日韩精品在线视频免费观看| 2025韩国大尺度电影| 热久久精品免费视频| 欧洲精品在线播放| 在线成人免费av| 女人高潮一级片| 日韩一级在线免费观看| 精品久久久久久久久久中文字幕| 亚洲日本黄色片| 日本在线观看免费视频| 一区二区传媒有限公司| 免费在线黄网站| 成年在线观看视频| 久久精品一二三四| 波多野结衣激情| 日韩精品aaa| 欧美视频亚洲图片| 午夜啪啪福利视频| 日本aa在线观看| 你真棒插曲来救救我在线观看| 欧洲精品在线播放| 五十路熟女丰满大屁股| www.日本少妇| 国产成人久久婷婷精品流白浆| 欧美日韩亚洲一| 91视频免费版污| 日韩 国产 一区| 成年丰满熟妇午夜免费视频| 欧美大片免费播放| 免费黄色日本网站| 亚洲国产日韩欧美在线观看| 国内精品国产三级国产99| 国产情侣第一页| 高清在线观看免费| 亚洲天堂一区二区在线观看| 国产在线视频三区| 欧美激情亚洲天堂| 久草资源站在线观看| 国产av人人夜夜澡人人爽| 国产成人黄色网址| 国产亚洲精品久久久久久久| 99色这里只有精品| 91香蕉视频导航| 蜜臀av.com| 天天操天天爱天天爽| 男人草女人视频| 日日噜噜夜夜狠狠| 黄色www网站| 久久久久久久久影视| 1314成人网| 欧美激情成人网| 日av中文字幕| 欧美aⅴ在线观看| 2022亚洲天堂| 人妻av无码专区| 九九热精品国产| jizz18女人| 丝袜老师办公室里做好紧好爽 | 亚洲高清免费在线观看| 黄色动漫在线免费看| 国产精品无码乱伦| 中文字幕国内自拍| 国产肥臀一区二区福利视频| 久久av高潮av| 300部国产真实乱| 男女污污视频网站| 三年中文高清在线观看第6集| 一级特黄性色生活片| 精品久久久久久久无码| 波多野结衣作品集| 一级特黄性色生活片| 一道本视频在线观看| 国产xxxxhd| 免费看国产曰批40分钟| 国产女主播av| 亚洲一二三不卡| 中文字幕精品一区二区三区在线| 成人在线观看a| 国产福利一区视频| 99色精品视频| 在线免费视频a| 天天视频天天爽| 国产精品igao网网址不卡| 激情久久综合网| 国产日产欧美一区二区| a天堂资源在线观看| 欧美视频在线观看视频| 日韩一级片免费视频| 国产精品无码人妻一区二区在线| 国产精品国产亚洲精品看不卡| 动漫av网站免费观看| 亚洲欧美久久久久| wwwwww欧美| 国产日韩一区二区在线| 中文字幕永久有效| av在线com| 91av俱乐部| 色一情一乱一乱一区91| 黄在线观看网站| 在线观看视频黄色| 农村妇女精品一二区| 亚洲无在线观看| 人妻精品无码一区二区三区| 国产福利片一区二区| 欧美日韩激情视频在线观看| 东京热加勒比无码少妇| 婷婷视频在线播放| 一本久道中文无码字幕av| 激情在线观看视频| 情侣黄网站免费看| 成年人网站国产| 超碰成人在线免费观看| 亚洲欧洲日产国码无码久久99| 免费黄频在线观看| 已婚少妇美妙人妻系列| 日韩不卡视频一区二区| 日本www.色| 午夜欧美福利视频| 日本欧美视频在线观看| 国产精品igao网网址不卡| 熟妇人妻va精品中文字幕| 精品人妻少妇一区二区| 麻豆md0077饥渴少妇| 色免费在线视频| 99精品免费在线观看| 日韩亚洲欧美视频| 中文字幕免费高| 久久久国产精华液999999| 亚洲精品无码国产| 欧美精品久久久久久久久久久| 天天干天天色天天爽| 波多野结衣在线免费观看| 亚洲黄色片免费看| 天天干天天爽天天射| 蜜臀久久99精品久久久酒店新书| 午夜免费福利小电影| 激情深爱综合网| 九色自拍视频在线观看| 国产精品333| 国产免费视频传媒|